The Path to Your Dream Home

A guide through the key steps to your dream home, from land selection and location information to conceptual design, permits and implementation plans.

The path to your dream home

Location Information

Slovenian Design Phases

Location information is a collection of all the relevant spatial criteria and conditions, requested from the municipality responsible for the plot on which you intend to build. Its data derives from the valid spatial planning documents for the area and specifies what may be built and under which conditions. It is useful to obtain this document before purchasing the plot, as it contains important information about the permitted form and size of the house, required approvals, protected areas, possible easements for access and similar matters. Anyone can obtain location information for any plot; proof of ownership is not required.

Building Plot

Building Design Phases

Before building, you should also check building rights and limits. When buying land, check ownership, encumbrances, easements and any other rights affecting construction. Verify property rights in the land registry and review planning restrictions with your designer. Land use and permitted construction follow the applicable planning rules. Location information, public planning maps and municipal information can help. A land-use designation alone does not establish that every condition for your proposed building has been met.

Geodetic Survey Plan

Building Design Phases

A geodetic survey plan is an important basis for placing the proposed building on the plot and recording existing terrain. Your designer identifies the survey data needed for the project. A surveying company prepares the plan; agree its commission and scope with your architect so everyone uses an appropriate spatial base.

Concept Design

Building Design Phases

Based on the agreement and the client’s requirements, the architect prepares a concept design as plans, sketches or spatial views. The architect connects your wishes with the plot and building conditions. This provides a basis for checking spatial possibilities and preparing the documentation needed to obtain project requirements and other relevant conditions.

Permit Documentation (DGD)

Building Design Phases

Construction type and plot location determine the relevant bodies and documents, including connections and basic building services – drinking water, electricity, wastewater and public-road access. Check planning rules, protection regimes and other project conditions. DGD supports assessment of the site and the required opinions. Submit the application with relevant documents, opinions and proof of the right to build where required. The administrative authority checks the conditions and decides whether the building permit may be granted.

Your designer defines the DGD documents and further project information:

  • all the DGD forms;

  • technical report presenting the building – DGD;

  • site and technical drawings of the building – DGD;

  • supporting information for fire safety;

  • supporting information on energy performance, where needed for the design and project requirements;

  • required supporting information on acoustic protection.

Detailed Design (PZI)

Building Design Phases

High-quality construction also requires a Detailed Design (PZI), which details the planned construction and provides coordinated drawings for the contractors on site.

Alongside the architectural plan, the structural engineering plan and the electrical and mechanical services plans are essential during construction. These plans should be prepared carefully and professionally in collaboration with the client and, above all, coordinated with one another. In practice, it is highly advisable to plan every material, element and item of equipment in advance. This avoids many site problems, incomplete solutions and often additional costs.

The Detailed Design (PZI) includes:

  • building architecture – PZI;

  • structural engineering/statics with reinforcement drawings – PZI;

  • electrical installation design from the distribution board onwards;

  • mechanical services design—heating, ventilation and water supply from the meter chamber onwards, plus internal drainage.