Self-Managed Construction or Delivery by KAGER HOUSE?
A guide to KAGER construction stages: site preparation, foundation slab, completed shell, technical fit-out and KAGER final fit-out.

Work Managed Directly by the Investor Before House Assembly Begins
Self-Managed Construction or Delivery by KAGER HOUSE?
This phase marks the start of construction after the project documentation and building permit have been obtained. It includes preparing the site, setting out the building, and excavating the foundation pit. It concludes with construction of the foundation slab.
The lower weight of a timber structure can make foundations less demanding than for masonry, with less excavation, formwork and reinforcement and suitable thermal protection beneath the slab. The solution always depends on the ground and the design. Long-term quality also requires a precise horizontal slab surface; as concreting alone may not achieve the required accuracy, we recommend installing a levelling bed.
Completed Shell
Self-Managed Construction or Delivery by KAGER HOUSE?
This stage covers work carried out by the KAGER HOUSE team of specialists: waterproofing beneath the walls, assembly of all structural elements with thermal and acoustic insulation, application of the final façade layer, finishing of all visible timber elements, and roofing and sheet-metal work.
The house elements are transported to the site on 18-metre articulated lorries with a load capacity of 20 tonnes. They are assembled using a mobile crane, also provided by our company. Roofing and sheet-metal work is carried out in collaboration with a team of specialist roofers and sheet-metal workers.
Windows, balcony doors, sliding doors, and all fixed glazing are installed in the wall elements at the factory. External and internal window sills and external blinds are added during assembly on site. The completed-shell stage also includes installation of the entrance door, which is fitted only after the screeds have been completed to prevent damage during earlier construction work.
Technical Fit-Out (Partial Fit-Out)
Self-Managed Construction or Delivery by KAGER HOUSE?
If you choose the technical fit-out (partial fit-out) stage, our specialists install the plumbing, heating system, optional cooling and ventilation, underfloor heating, first-fix electrical installations with all wiring and internal distribution boards, and the cement screed.
Interior Finishing – KAGER Final Fit-Out
Self-Managed Construction or Delivery by KAGER HOUSE?
This stage includes installing plasterboard on external and internal walls and on ceiling and roof structures; interior decorating work, including taping and filling joints, installing expansion profiles between timber elements and linings, applying two coats of paint to walls and ceilings, and finishing all visible interior timber; second-fix electrical work with all selected switches and sockets; installation of the finished internal staircase with balustrade; and installation of the selected internal doors.
KAGER final fit-out excludes final floor coverings, tiles and sanitary fittings. These are included in complete turnkey delivery, within the scope defined in the quotation and contract. We generally offer complete turnkey delivery in Slovenia and Croatia; for other countries, scope and price are assessed individually for each project.